Berstein Management, located in the Metropolitan DC area, is a regional leader in real estate management and development. Started in 1953 by Norman Berstein, they hold a portfolio of over 80 properties with 3.5 million square feet of commercial space and nearly 5,000 apartments. One of their properties is 2100 Connecticut Avenue in the Kalorama area of Northwest DC.
Situated North of Dupont Circle, the historic neighborhood is home to many influential people from media and politics. Much of the worlds embassies to the United States surround the area.
Sitting on the "grand avenue," 2100 Connecticut Avenue was built in 1941 in the Art Deco Style. Each apartment had a glass block window with an opaque fluted design to allow generous light into the living space. This design was extremely popular in that era. The existing glass block, being over 70 years old, had reached the end of its life cycle. This issue was the reason Bernstein Management contacted GBA Architectural Products + Services.
GBA went to the site and discovered that the block was a specially made radial block. To meet the requirements of the Historical Preservation Office, the block had to be replaced in kind. That required new molds to be made since this radial block had been discontinued prior to the renovation. A radial block is a glass block with a larger outside face than inside face. This allows the blocks to be laid in a tighter than normal radius, while keeping consistent interior and exterior head joints.
In addition, the mortar had to match existing color and texture. The existing steel frame had to be remediated, prepped, and recoated to maintain a similar appearance. It also had to meet manufacturers specifications to ensure proper performance for the next 70 years. This is what GBA has done and continues to do for our clients.
GBA went to work with the Bernstein project management team. Together, we received approval on all materials and components needed to perform the work. The next hurdle was the actual execution. Keeping in mind that 2100 Connecticut is in an upscale neighborhood, landscaped meticulously and inhabited by many large flowering cherry, dogwood, and maple trees - our work had to be performed in over 50 fully furnished and occupied apartments.
Through exhaustive planning and communication, the job went off with minimal impact on the tenants and neighborhood. The result was termed "a complete success," and GBA is proud to restore the building's history with the technology from a new era.
"Work was done very professionally with outstanding quality. Your crews were very attentive to detail & made sure to protect surrounding work surfaces from damage. They communicated well with my field team to ensure we & the Owner were satisfied with the end product. Job well done." - Russell Stafford, RNGD A Palmisano Company
"We were lucky to have GBA on our project at Lutheran East High School. From the front office to the field supervision and crew were very knowledgeable with our project. Took extra care not to damage the building during demolition. The quality of materials and their labor force was top-notch." — Peter Powell, Carey Construction Group
"We are extremely pleased with the outcome of the glass block at Lutheran East High School and have received many compliments on the design. The glass block windows give the building a nice “pop” of color on the exterior each side of the gym and helped to maintain the identity of the school." - Rick Jozity, Meraki Architects, L.L.C
"I saw the final glass block wall in person and it really is a work of art. We are so grateful for your team’s hard work on this." – Crister Cantrell, Gensler
"As the Senior Project Manager for the general contracting company responsible for completing all aspects of the historical restoration, structural rehabilitation, and adaptive reuse modifications to the derelict Triboro tuberculosis hospital, one of the most difficult challenges was finding capable and qualified subcontractors for the key restoration trades that are both committed to quality construction and respectful of the historical restoration process. I am lucky enough to have worked with GBA on previous successful projects and was glad to bring them into this project. GBA provided the essential expertise and quality craftsmanship that this project needed and was a reliable partner helping us convert the Triboro Tuberculosis Hospital into the T Building Residence." – Senior Project Manager, Bill Harwood for the GC, Mega Contracting
"On behalf of me, my project manager and CGC; I would like to reach out to applaud the quality and workmanship of the crew sent out to do the glass block wall outside of the theater here in Hudson. Dan and Nate went above and beyond to keep their work area organized and clean, even protected our finish trim and VWC in the mixing area with plastic. If only more companies active on site would follow in your companies steps these buildings would be cut and dry and run very efficiently. Thank you! - Jake M. Behler, Cameron General Contractors
Midwest (877) 280-7700
East Coast (212) 255-5787
West Coast (213) 634-7050
All contents © Medina Glass Block, Inc